Fifth EMBRAER 170 Aircraft Debuts at Farnborough
MEDIA CENTER

MEDIA CENTER

News - Corporate

Fifth EMBRAER 170 Aircraft Debuts at Farnborough

Published

July 24, 2002

Share

Fifth EMBRAER 170 Aircraft Debuts at Farnborough

Farnborough, July 24, 2002 – The fifth EMBRAER 170 is present in Farnborough performing demonstration flights for Embraer clients and representatives of the Press, charming passengers and visitors at the airshow.

The fifth EMBRAER 170 aircraft arrived in Farnborough last Friday, directly from Embraer’s headquarters in São José dos Campos, Brazil, where it took off on Wednesday evening. The flight plan included stops in the city of Natal, in the northeast of Brazil, the Isle of Sal and the city of Faro, Portugal, from where it departed last Friday morning to Farnborough, arriving a few hours later.

Up to now, the fifth EMBRAER 170 aircraft has accumulated more than 52 hours of flight time, after joining the other four aircraft already in use in the certification campaign. Aircraft S/N 0005 is the first to have a fully equipped passenger cabin, outfitting the distinctive way the standard aircraft will be configured, with 70 seats at 32 pitch and 2 lavatories.

The airplane will remain in Farnborough until next Thursday and will then depart for a short demo tour in Europe.

The first flight of the EMBRAER 170 S/N 0005 took place last July 14, in São José dos Campos, Brazil. It is part of an aggressive certification program of the first member of Embraer’s family of new commercial jets, the EMBRAER 170, EMBRAER 175, EMBRAER 190 and EMBRAER 195. The maiden flight lasted 7 hours and was completed successfully, as has been the case with the other four preceding EMBRAER 170 aircraft.

The flight of the fifth EMBRAER 170 took place only five months after the inaugural flight of the first aircraft. To date, the five aircraft have accumulated a total of 325 hours flying time.

The sixth EMBRAER 170 aircraft will also feature fully equipped production interior. This aircraft will initially be submitted to electromagnetic interference and lightning tests, and will later join the flight test program.

The EMBRAER 170 shall be certified in the first quarter of 2003, followed by delivery of the first production aircraft to Switzerland’s SWISS.

Share
CLOSE
Embraer