News - Corporate
Embraer Aircraft for SIVAM Are Certified
June 26, 2002
São José dos Campos, June 26, 2002 –The Brazilian Civil Aviation Authority last Monday (June 24) issued Supplemental Type Certificates (STC) for the R-99A and R-99B aircraft manufactured by Embraer for the Brazilian Air Force (FAB). Both models are part of the Amazon Surveillance System (SIVAM) project.
The R-99A is an Airborne Early Warning and Control (AEW&C) aircraft equipped with a powerful surveillance radar located on the its upper side and is designed for airspace vigilance and patrol. The R-99B is equipped with a different radar system, installed on the underside of the aircraft and used for ground and geological surveys and the tracking of ground moving objects. Both versions also are equipped with systems monitoring and intelligence of radar and communications transmissions. The two aircraft, reinforced and modified, are derived from the ERJ 145 regional jet, one of Embraer’s major commercial successes.
In order to receive their Type Certification, the two models underwent more than 1,000 hours of flight testing during which they were submitted to extreme conditions. The certificates issued to the R-99A and R-99B attest that the two defense aircraft for the SIVAM project possess the same level of flight safety as large commercial passenger jets.
Embraer’s Defense Programs Director, Luis A. Hernandez Gonzalez, explains that very few aircraft of this type anywhere in the world have received this level of airworthiness certification: “It is not common for aircraft in this category to pass civilian airworthiness processes, since they are not used to carry passengers. And, despite the modifications that have been made in order to install equipment such as the AEW radar, the SIVAM aircraft have retained the same levels of flight safety as commercial jets.”
FAB already is operating one of the airplanes out of Anápolis and the other from Manaus as part of its process for taking delivery of the aircraft and training the flight crews. With certification, the delivery process for the first SIVAM aircraft has now entered its final phase and should soon be concluded.