EMBRAER 170 Test Campaign Accelerates as the Second Prototype Enters Operation
MEDIA CENTER

MEDIA CENTER

News - Corporate

EMBRAER 170 Test Campaign Accelerates as the Second Prototype Enters Operation

Published

May 02, 2002

Share

EMBRAER 170 Test Campaign Accelerates as the Second Prototype Enters Operation

São José dos Campos, May 2nd, 2002 - The EMBRAER 170 flight test program is progressing at an ever-increasing pace, following the April 9th first flight of the second prototype, NS 0002. The test results are satisfying the aggressive aircraft performance targets set by the company. The success of the flight test program heralds a new generation of 70-110 seat jets which will set the industry standard for cabin comfort and operating economics for aircraft in its class.

Since its first flight on February 19th, 2002, prototype NS 001 has completed 36 flights for a total of 73 hours & 05 minutes. Prototype NS 002 has already accomplished 17 flights and accumulated 22 hours & 28 minutes.

The EMBRAER 170/190 Program Director, Luís Carlos Affonso, reports that “both test aircraft have performed according to plan, exhibiting reliability and operational efficiency figures beyond expectations”. His report was enthusiastically received by the hundreds of dedicated Brazilian and international program specialists at Embraer’s facilities at São José dos Campos, Brazil, who are all highly motivated by the success of the test campaign.

Flight tests completed to date are: • Flying characteristics in all landing gear configurations and CG envelope• Anemometric system calibration.• Air data bank validation.• In-flight engine and APU start at different flight levels and speeds.• Single-engine climb performance • Maximum braking performance test• Nav/Com system evaluation.• Landing gear spray tests (performed on the new runway at Embraer’s Gavião Peixoto facilities)• Natural Stall test campaign is currently under way

A significant milestone was achieved on April 12th, when General Electric’s GE CF34-8 engine was awarded FAR33 type certification. Embraer has selected this engine to power the EMBRAER 170 & EMBRAER 175.

From now until June, four new EMBRAER 170 prototypes will join the flight test campaign, for a total of six test aircraft. This will ensure a target certification date scheduled for the first quarter of 2003, followed by delivery of the first series unit to launch customer SWISS, of Switzerland.

Since its launch at the 1999 Paris Air Show, Embraer has a total of 112 firm orders and 202 options for the EMBRAER 170/190 family.

Share
CLOSE
Embraer