EMBRAER 170 ALCA VOO
MEDIA CENTER

MEDIA CENTER

News - Corporate

EMBRAER 170 ALCA VOO

Published

February 19, 2002

Share

EMBRAER 170 ALCA VOO

São José dos Campos, February 19, 2002 – Embraer informed today that the EMBRAER 170, its first jet of a new 70-to-108 seats aircraft generation, flew for the first time this Tuesday. Prototype #0001, bearing Brazilian register PP XJE, was declared airborne from the 10,000-ft. runway 15 by the São José dos Campos control tower at exactly 11:37 hours UTC/GMT (08:37 hrs. local). Weather was clear with slight, 6/8 overcast and 21o Celsius temperature at ground level.

“This is another milestone for Embraer, a very special and rewarding moment to be in our minds forever”, enthusiastically remarked Maurício Botelho, Embraer President and CEO. “The roll out ceremony in late October 29 was remarkable for all of us, but to watch our new, bigger bird taking off was pure joy, which I want to share with every Embraer employee, to whom I present my compliments for their determination and commitment”, added he.

Upon deplaning from the EMBRAER 170, test pilots Luiz Carlos Rodrigues and Eduardo Camelier, together with flight test engineer Gilberto Cardoso, were pleased with the maiden flight. Everything went according to plan, they said. “Above all, it was truly satisfying and the aircraft did better than was foreseen, it was beyond expectations. The first impression was excellent. Embraer has another great aircraft”, said Capt. Rodrigues.

PT-XJE was aloft for two hours and thirty minutes and several maneuvers were performed to check the aircraft’s flight characteristics. The landing gear and flaps were cycled exhaustively under in-flight aerodynamic loads, with good results.

The first flight was preceded by low and high-speed taxiing tests on the previous days, when speeds of 35 and 110 knots Indicated Air Speed were attained several times, according with standard test procedures. The final phase of this test sequence was today when Capt. Rodrigues called out “rotate” and pulled back the fly-by-wire-controlled yoke.

The development and certification campaign with 6 flight test aircraft and two structural test articles allows Embraer to foresee certification by the end of 2002. However, the Company is reassessing the impacts of the delay of approximately 2 months in the beginning of the test campaign and intends to confirm the forecast in the coming weeks.

The development of the other family members, the EMBRAER 175, 195 and 190, proceeds as planned, aiming at first deliveries on July 2004, December 2004 and December 2005, respectively.

The EMBRAER 170/190 Program was launched at the 1999 Paris Air Show in Le Bourget and registers 112 firm orders and 202 options to date.

Share
CLOSE
Embraer